University of Michigan - CH2M Hill (2007)
|
|
Performed on-site decommissioning and waste management for the decommissioning of the Ford Reactor
Facility. Characterized irradiated reactor components, developed characterization and waste
management plans. Supervised waste packaging, loading and transportation of all wastes
removed. Developed shipment documentation, and provided interface with regulators.
|
|
|
Comanche Peak - Curtiss-Wright (2007)
|
|
Designed, fabricated and supplied a container for transport by barge and truck of the
new intact reactor head. The container is convertible to an IVHTS (Intact Vessel Head
Transport System) for potential packaging of the old reactor head for storage/disposal. Developed
and supplied procedures and technical oversight for packaging operations. Provided characterization
of RVH and steam generators under separate contract direct to the utility.
|
|
|
Farley Units 1 & 2 - Westinghouse (2006)
|
|
Supplied DOT exempted packaging for two RPVHs for shipment for disposal. Provided
waste characterization for both RPVHs. Provided procedures and technical oversight for
packaging operations. Both RPVHs shipped for disposal.
|
|
|
West Valley Demo Project - WVNSCO (2004)
|
|
Provided technical support for decommissioning the WVDP Vitrification facility. Initially,
developed designs and plans for removal and packaging of three large components; the Melter,
CFMT and MFHT tanks. Designed and permitted DOT packages for these components and provided
the shielded packaging. Provided on-site technical support during component removal and
packaging for transport and disposal. Provided waste characterization for all three components.
|
|
|
Surry Unit 2 - Dominion (2003)
|
|
Characterized RPV head. Designed shielded container for intact transport of RPV head with
attached CRDM bundle and prepared generic DOT exemption request for RPV heads-the first of its
kind. Provided for shielded container fabrication with delivery in mid-September. Head replacement
scheduled during outage in October 2003. After packaging, provided for truck transport of package
to processor.
|
|
|
Surry Unit 1 - Dominion (2003)
|
|
Characterized RPV head. Designed shielded container for intact transport of RPV head. Provided for
shielded container fabrication and packaged for disposal during last Surry 1 outage in July 2003. Arranged
for truck transport and disposal at Envirocare in early August 2003.
|
|
|
North Anna Units 1 & 2 - Dominion (2003)
|
|
Characterized RPV heads. Designed shielded container for transport of RPV heads. Provided for shielded
container fabrication and packaged for disposal during last outages in December 2002 and March 2003. Arranged
for truck transport and disposal at Envirocare for both units with second unit disposed in May 2003.
|
|
|
Davis Besse - FirstEnergy (2003)
|
|
Characterized RPV head. Designed shielded container for transport of RPV head. Provided for
shielded container fabrication and packaged in late 2002. Provided for rail transport and disposal at
Envirocare in August 2003.
|
|
|
Rancho Seco - SMUD (2003)
|
|
Performed activation analysis of reactor vessel and internals to provide basis for intact shipment of
reactor vessel and removal of GTCC waste. Evaluated SAFSTOR option for decommissioning.
|
|
|
SONGS - Duratek (2003)
|
|
Designed and permitted reactor vessel package. Prepared DOT exemption request. Prepared drawings and
specifications for package and tie-down system manufacture.
|