Current Projects
|
|
|
Bruce Power Steam Generators(Bruce Power)
|
|
WMG has been awarded a contract to perform preliminary engineering assessments,
characterization, package qualification, and transportation oversight for the
shipment of 16 CANDU steam generators from Canada's Bruce plant to the Studsvik AB
Facility. This first of a kind project will also require WMG to initiate the international
shipping documentation required to transport these generators overseas to Sweden.
|
|
APS RVH Support (Westinghouse)
|
|
Westinghouse Electric Company has retained WMG to provide characterization and packaging support for
Palo Verde’s three retired Reactor Vessel Heads (RVH). WMG characterized the first RVH which also
included the design, fabrication, and installation of a leak-tight shielded package, in October
2009. Starting in April 2010, WMG will provide the same service for the second unit and October 2010
for the third. Upon completion, WMG will have successfully packaged a total of 15 retired RPV's;
each having presented its own set of unique challenges.
|
|
ENRESA (Spain)
|
|
ENRESA, Spain’s radioactive waste management company, has retained WMG to provide reactor vessel and
internals characterization, and segmentation support for the Jose Cabrera Nuclear Power Station. Jose
Cabrera NPS, also known as Zorita, is a 160 MWe Pressurized Water Reactor located 43 miles east of
Madrid. WMG will also provide on-site support during dose profiling activities of the reactor vessel
internals, as well as, technical reviews and evaluation support of offers provided by prospective segmentation
vendors. WMG's final characterization of Zorita's reactor vessel internals is to be used to develop final
segmentation plans.
|
|
South Texas Project Units 1 & 2 (Westinghouse)
|
|
Characterizing RPV heads and providing input into mausoleum design. Designing, fabricating
and supplying storage containers for intact RVHs. Developing packaging procedures and
providing technical oversight during packaging, and on-site transport.
|
|
|
|
Utility Clients
|
|
Utilities and replacement contractors alike rely on our unmatched ability to characterize,
package, ship and dispose of their most challenging waste forms. From the smallest fuel
pool debris to reactor vessel assemblies we get the job done on time, on budget and on
schedule - just ask our clients.
|
|
• American U.E.
|
• American Electric Power Company
|
|
• Arizona Public Service Company
|
• Bruce Power L.P.
|
|
• CH-PRC
|
• Constellation Energy Group
|
|
• Consumers Energy Company
|
• Detroit Edison
|
|
• Dominion
|
• Duke Energy Corporation
|
|
• Energy Northwest
|
• ENRESA
|
|
• Entergy Nuclear Northeast
|
• Entergy Operations, Inc.
|
|
• Exelon Generation Company LLC
|
• FirstEnergy Service Company
|
|
• Florida Power & Light
|
• FPL Energy Seabrook LLC
|
|
• Northern States Power
|
• Pacific Gas & Electric Company
|
|
• PPL Susquehanna LLC
|
• Progress Energy
|
|
• PSEG Nuclear LLC
|
• South Carolina Electric & Gas Company
|
|
• Southern California Edison Company
|
• Southern Nuclear Operating Company, Inc.
|
|
• STP Nuclear Operating Company
|
• Tennesee Valley Authority
|
|
• TXU Generation Company LP
|
• Washington Closure Hanford
|
|
• We Energies
|
• Wolf Creek Nuclear Operating Corporation
|
|
• Yankee Atomic Electric Company
|
|
|
|
Commercial and Government Clients
|
|
WMG has successfully completed well over 1,000 projects related to the management of radioactive
materials in the commercial sector that includes all of the operating nuclear power plants. Our D&D
project work has supported every commercial project to date since Shoreham in 1994. We are considered
the waste management leader within the commercial nuclear power industry and have set the standard for
current commercial methods and practices.
|
|
• Argonne National Laboratory
|
• Bartlett Nuclear, Inc.
|
|
• Betchel Group, Inc.
|
• Betchel Power Corporation
|
|
• Brookhaven National Laboratory
|
• Burns & Roe Enterprises, Inc.
|
|
• Cernavoda-Romania
|
• CH2M Hill
|
|
• CH-PRC
|
• Curtiss Wright Electro-Mechanical Corp.
|
|
• Dames & Moore Group
|
• EnergySolutions LLC
|
|
• ENRESA
|
• EPRI
|
|
• FBI
|
• Fluor Corp.
|
|
• Framatome ANP DE&S
|
• General Atomics
|
|
• Kaiser-Hill Company LLC
|
• Kansas Department of Health
|
|
• Maxey Flats Steering Committee
|
• Merck & Co., Inc.
|
|
• NAC International
|
• Northrop Grumman
|
|
• NYSERDA
|
• NNSY Norfolk Naval Shipyard
|
|
• Oak Ridge Associated Universities
|
• Oak Ridge National Laboratory
|
|
• Polestar Applied Technology, Inc.
|
• Premier Technology
|
|
• Priceton Plasma Physics Laboratory
|
• URS Corp.
|
|
• NUKEM Corporation
|
• R.O.V. Technologies
|
|
• Sevenson Environmental Services, Inc.
|
• The Babcox and Wilcox Company
|
|
• United States Military Academy, West Point
|
• Washington Closure Hanford
|
|
• Washington Savannah River Company
|
• West Valley Nuclear Services Company LLC
|
|
• Westinghouse Electric Company LLC
|
• Westinghouse Government Services LLC
|
|
|
|
Past Projects
|
|
|
University of Michigan - CH2M Hill (2007)
|
|
Performed on-site decommissioning and waste management for the decommissioning of the Ford Reactor
Facility. Characterized irradiated reactor components, developed characterization and waste
management plans. Supervised waste packaging, loading and transportation of all wastes
removed. Developed shipment documentation, and provided interface with regulators.
|
|
|
Comanche Peak - Curtiss-Wright (2007)
|
|
Designed, fabricated and supplied a container for transport by barge and truck of the
new intact reactor head. The container is convertible to an IVHTS (Intact Vessel Head
Transport System) for potential packaging of the old reactor head for storage/disposal. Developed
and supplied procedures and technical oversight for packaging operations. Provided characterization
of RVH and steam generators under separate contract direct to the utility.
|
|
|
Farley Units 1 & 2 - Westinghouse (2006)
|
|
Supplied DOT exempted packaging for two RPVHs for shipment for disposal. Provided
waste characterization for both RPVHs. Provided procedures and technical oversight for
packaging operations. Both RPVHs shipped for disposal.
|
|
|
West Valley Demo Project - WVNSCO (2004)
|
|
Provided technical support for decommissioning the WVDP Vitrification facility. Initially,
developed designs and plans for removal and packaging of three large components; the Melter,
CFMT and MFHT tanks. Designed and permitted DOT packages for these components and provided
the shielded packaging. Provided on-site technical support during component removal and
packaging for transport and disposal. Provided waste characterization for all three components.
|
|
|
Surry Unit 2 - Dominion (2003)
|
|
Characterized RPV head. Designed shielded container for intact transport of RPV head with
attached CRDM bundle and prepared generic DOT exemption request for RPV heads-the first of its
kind. Provided for shielded container fabrication with delivery in mid-September. Head replacement
scheduled during outage in October 2003. After packaging, provided for truck transport of package
to processor.
|
|
|
Surry Unit 1 - Dominion (2003)
|
|
Characterized RPV head. Designed shielded container for intact transport of RPV head. Provided for
shielded container fabrication and packaged for disposal during last Surry 1 outage in July 2003. Arranged
for truck transport and disposal at Envirocare in early August 2003.
|
|
|
North Anna Units 1 & 2 - Dominion (2003)
|
|
Characterized RPV heads. Designed shielded container for transport of RPV heads. Provided for shielded
container fabrication and packaged for disposal during last outages in December 2002 and March 2003. Arranged
for truck transport and disposal at Envirocare for both units with second unit disposed in May 2003.
|
|
|
Davis Besse - FirstEnergy (2003)
|
|
Characterized RPV head. Designed shielded container for transport of RPV head. Provided for
shielded container fabrication and packaged in late 2002. Provided for rail transport and disposal at
Envirocare in August 2003.
|
|
|
Rancho Seco - SMUD (2003)
|
|
Performed activation analysis of reactor vessel and internals to provide basis for intact shipment of
reactor vessel and removal of GTCC waste. Evaluated SAFSTOR option for decommissioning.
|
|
|
SONGS - Duratek (2003)
|
|
Designed and permitted reactor vessel package. Prepared DOT exemption request. Prepared drawings and
specifications for package and tie-down system manufacture.
|
|
|
|